搜索信息

Construction case
Home > Construction case

Atush of the Third Bureau of Hydropower - 2HZS90 concrete batching plant

2025-01-02

1. Project overview: The G219 line Aheqi County to Bapanshuimo Highway construction project is located in Aheqi County and Harajun Township, Kizilsu Kirgiz Autonomous Prefecture, Xinjiang Uygur Autonomous Region, with a total length of 254.876km. The pile number K274+500~K284+720 that is responsible for the construction of this project is 10.22km in total, the roadbed width of this section is 10m, the designed speed is 60km/h, and the range includes 3406.5m/15 bridges, 308m/4 middle bridges, 141.25m/6 culverts, and 1894m/1 tunnels.

Roadbed and pavement are 4611.5m. 1 tunnel, the width of the tunnel is 10m and the height of the tunnel is 5m; the tunnel lining adopts composite lining

Building method. The roadbed and cover culvert projects are intertwined between the bridge projects.

2. Equipment name and model: HZS90 concrete mixing station

3. Quantity: 2 sets       Time: May 2020     Location: Atushi City, Xinjiang

4. Example photo:


© 2026 Xinjiang Oasis Machinery Co., Ltd  All Rights Reserved. 腾云建站仅向商家提供技术服务