1. Project Overview: Fukang Pumped Storage Power Station in Xinjiang, the project is located in Sanchazigou Township, Shanghugou Township, Fukang City, Changji Prefecture, Xinjiang, about 70km away from Fukang City (including about 20 kilometers of asphalt roads in 126 township roads). The main buildings include: concrete panel rock pile dam of the main dam of the Shangshui Reservoir, the auxiliary dam at the tail end of the Shangshui Reservoir (Xichagou Sub-dam and Xizhigou Sub-dam), the upper and lower reservoir basin project, the upper and lower reservoir power station inlets and outlets, water transmission tunnels, underground power plant buildings and ground switch station projects, upper and lower reservoir valley mudslide blocking facilities and other buildings; the main projects: the total amount of earth and stone excavation of Shangshui Reservoir is 8.54 million m³, the total amount of filling is 5.71 million m³, the excavation of the water transmission system and underground power plant is about 640,000 m³; the concrete volume is about 500,000 m³.
2. Equipment name and model: HZS180 concrete mixing station
3. Quantity: 1 set time: March 2020 Location: Babao Town, Qilian County, Haibei Tibetan Autonomous Prefecture, Qinghai Province
4. Example photo: