1. Project Overview: The river diversion project is a necessary project to improve the water resource allocation capacity of the Han River, increase the water transfer capacity of the Han-Wei Project and the Han-Wei Project, and improve the water supply guarantee capacity of the middle line. It is a water resource guarantee project for the important national strategy and development layout. It is a major ecological project to alleviate the ecological environment pressure in the middle and lower reaches of the Han River and improve the ecological environment of the middle line water-receiving area. After the project is implemented, the water transfer volume of the mid-line project and the Hanwei-guided project can be increased, the water supply guarantee capacity of the mid-line is improved, water supply can be supplied to the project, and the ecological environment problems in the middle and lower reaches of the Han River can be alleviated, and the green development of the Han River basin and the water-receiving area can be effectively supported, and the benefits of the north and the south can be achieved.
2. Equipment name and model: HZS120, HZS180 container concrete mixing station
3. Quantity: 2 sets Time: December 2023 Location: Gucheng County, Xiangyang City, Hubei Province
4. Example photo:

