搜索信息

Construction case
Home > Construction case

HZS180 container concrete mixing station, Xiamen Airport, 16th Bureau of Hydropower

2025-01-02

1. Project Overview: This project is located in Dali Island, Xiang'an District, Xiamen City, Fujian Province. This period of the flight zone track project has built one runway in the south and north flight areas. The runway in the North Flight Zone is 3800m long and has a level of 4F. Parallel taxiways are provided on both sides of the runway, and are equipped with systems such as fast exit taxiways, end contact channels, side channels, and bypass taxiways. The runway in the South Flight Zone is 3600m long and has a level of 4E. A parallel taxiway is built on the north side of the runway. The connecting lanes and side passages at both ends of the South Flight Zone meet the operating requirements of the 747-8 aircraft. Vertical contact channels that meet the operation of 747-8 models are respectively built at both ends of the south and north runways, and facilities such as near-aircraft, far-aircraft, maintenance apron, and freight apron are built. Our company won the bid: Xiamen New Airport Project-Airport Project-Airport Project-East Zone Field Road Project Section 2, located in the eastern section of the North First Runway, with a length of about 2,765m and an area of about 2.9 million square meters. It includes earthwork, foundation treatment, foundation, road surface, drainage, field patrol road, light belt underpass, oil and water separation system, shielding, sewage pipeline project, civil engineering part of the light trest at the east end of the runway, and boundary.

2. Equipment name and model: HZS180 container concrete mixing station

3. Quantity: 1 set             time: January 2024         Location: Xiang'an District, Xiamen City, Fujian Province      

4. Example photo:


 

© 2026 Xinjiang Oasis Machinery Co., Ltd  All Rights Reserved. 腾云建站仅向商家提供技术服务