Construction case
Home > Construction case

China Railway 10th Bureau------Afujun Railway Project

2025-01-02

1. Project Overview: The main line of Afuzhun Railway is 427 kilometers long, of which 153 kilometers are Altay to Fuyun County, and 274 kilometers from Fuyun to Zhundong section, with a total investment of about 9.5 billion yuan. The S2 standard in front of the station project of the Altay to Fuyun section of the Afuzhun Railway was built. The main line of the Afuzhun Railway project line map is 133.5 kilometers long. The main project volumes within the construction scope include: 20 kilometers of power lines, 9 communication relocations, 9.91 million cubic meters of earth and stone in the roadbed area, 10 super bridges, 20 bridges, 18 middle bridges, 3 tunnel projects, and 133 kilometers of 35KV Yonglin combined with power through line. The Afujun Railway starts from Altay, the end of the North A railway in the west, passes through Karamay to Altay Expressway, crosses the Kran River and then turns southeast, crosses the Kalasuke Reservoir eastward along the southern foot of the Altai Mountains, crosses the Ertise River to the southeast to the Fuyun Line Chengnan Industrial Park to set up a Fuyun Station, crosses the Ulungu River to the southward through Chakurtu, crosses the experimental area of the Kalamali Mountain Nature Reserve along National Highway 216, and heads south to the north end of the Jung Northeast Station to connect to the Wu (North)-Jiang (Junmiao) railway. The total length of the line is 428.438 kilometers, and there are 28 stations distributed across the line (including three stations in Altay, Jundong and Junbei Northeast).

2. Equipment name and model: HZS120 concrete mixing station

3. Quantity: 5 sets       Time: July 2016     Location: Xinjiang Fuyun

4. Example photo:


© 2026 Xinjiang Oasis Machinery Co., Ltd  All Rights Reserved. 腾云建站仅向商家提供技术服务