1. Project Overview: The project is located in the northern plain area of Gulang County, Gansu Province and the southern edge of the Tengger Desert. Construction started in March 2023 with a total investment of 289 million yuan. The total designed volume is 4.9 million cubic meters, there is 1 supporting management room and 1 pump station, nearly 5,000 meters of water supply pipes of various types, 14 valve wells of various types, 1 pump room collection wells, and the DN800 ductile iron pipe is removed 1775 meters, the newly built Shangba management and asphalt roads on the top of the dam are about 3.5 kilometers.
2. Equipment name and model: HZS120 container concrete mixing station
3. Quantity: 1 set time: June 2023 Location: Gulang, Gansu