At the Naomaohu 180 batching plant installation site, today is the third day of installation.
Day 1: Assembled the modular foundation, first level of the main machine, and the control room.
Day 2: Strong wind and rain in the morning; assembled the second level and the inclined belt in the afternoon.
Today: Installed the rain shelter, erected the inclined belt, guided chute, and flat belt.
Planned for tomorrow: Install the batching machine enclosure, position the batching machine, and assemble the silo support legs.


